 My big milestone this week was to epoxy the sub deck onto the top of the boat.  I used 1/4" Okoume Marine Plywood for the sub deck.  Once again my brother Gary came over and spent the entire day.  A very good friend Dave Pohl helped out for a good part of the afternoon.  We had a great system set up with one guy mixing epoxy and then spreading it out, drilling, countersinking the holes and then putting in the 3/4" silicon bronze screws.   Now that the entire sub deck has been installed, I will need to get the overhanging material trimmed flush with the edges so that the stainless steel bumper rails will fit properly along with the cabin areas so they will accept the trim molding.