I was able to get my keel cut and fitted. We started out with a twelve foot piece and trying to rip that piece of lumber on my table saw in my basement without help would have been a real challenge. No worries, simple deal with the right tool and great help.
My Shopsmith, was a perfect tool to do the horizontal boring in the "Knee".
Other big accomplishments were getting the "Knee" mounted to the "Transom" and the "Keel". It is all epoxy (glued) and screwed in place.
My Shopsmith, was a perfect tool to do the horizontal boring in the "Knee".
Other big accomplishments were getting the "Knee" mounted to the "Transom" and the "Keel". It is all epoxy (glued) and screwed in place.
The next step will be to mount the keel to the "Stem" (front of the boat, bow) and the Frames". Gary and I are planning on doing this tonight. Then boat building will come to a halt for a few weeks. I am going to Guanajauto, Mexico to fly my Hot Air Balloon and then I will be taking a weekend trip to Chicago to visit my daughter and son-in-law in their new home.
No comments:
Post a Comment